Use the dropdown to read archived news articles.
On March 22nd 2007, almost 3 weeks ahead of schedule Bouygues UK successfully handed over the newly refurbished Special Educational Needs area. The area has replaced the old library which has been stripped out and refurbished to provide the school with a life skills classroom, a physiotherapy room, bathroom facilities and a number of teaching areas. The Easter break has allowed the school to decant all equipment into the new SEN area ready for the students return after the Easter break.
Operations - 14/09/2006